PCG values a personal "Hands-on" approach in each phase of the building process. We offer our clients extensive knowledge in design and construction which fosters a well managed project. Throughout the course of a project, PCG monitors the progress of each job by reviewing specific components necessary to ensure the highest level of performance, and whenever possible we make improvements to cost, quality and productivity.
 |
|
 |
| PALMETTO VILLAGE CENTER |
$2,800,000 |
The Palmetto Village Center is a 20,000 square foot, 2-story office building. Located on Chuck Dawley Boulevard in Mt Pleasant, South Carolina, this development included all exterior finishes and all interior common areas including a complete office upfit for a local law firm.
 |
|
 |
| TRIDENT EXECUTIVE VILLAGE |
$1,700,000 |
A 14,000 square foot medical office building, Trident Executive Village is located adjacent to Trident Medical Center in North Charleston, South Carolina. This project entailed the upfit of multiple tenant suites.
 |
|
 |
| SUMMERVILLE TOWN HALL |
$14,500,000 |
Four Phase Project for the Town of Summerville which included the construction of three new buildings and the renovation of the Existing Town Hall Building:
Phase 1:
5 Story / 71,000 square foot Parking Garage Facility - Concrete Pile Supported Foundations, Precast Concrete Structure, Topping Slabs, Fire Protection, Elevator, Traffic Controls, M.E.P., Etc.
Phase 2:
3 Story / 22,800 square foot Annex Building - Concrete Pile Supported Foundations, Structural Steel Frame, Brick Verneer, Precast Concrete, Frameless Glass Curtain Walls, Standing Seam and Built-up Roofing, Stainless Steel Hand Railings, Powder Coated Exposed Steel, Metal Stud Framing, Interior Finishes, Terrazzo Flooring, Custom Woodwork, Auditorium Seating, Elevator, Mechanical (Geothermal Well System), Electrical, Plumbing, Etc.
Phase 3:
2 Story / 10,000 square foot Retail Building - Concrete Pile Supported Foundations, Structural Steel Frame, Metal Stud Framing, Brick Verneer, Precast Concrete, Aluminum Storefront, Built-up Roofing, Elevator, M.E.P., Etc.
Phase 4:
Renovation of Existing 2 Story / 10,000 square foot Town Hall Building - Demolition of existing interior finishes and M.E.P. systems, Metal Stud Framing, Drywall, Insulation, Painting, Interior Finishes, Terrazzo Flooring, New M.E.P. systems, etc.
 |
|
 |
| EDISTO BEACH STATE PARK |
$2,612,000 |
Edisto Beach State Park was built for the South Carolina Department of Parks, Recreation & Tourism. The construction project consisted of a building with office space, classrooms, and a public exhibit area as well as an 800 foot long dock allowing guest access to Big Bay Creek. This oceanfront park and education facility is located in the ACE Basin, one of the nation's largest preserved estuaries. This was the first South Carolina LEED certified building constructed and included rigorous on-site inspections to ensure water conservation, non-toxic materials, energy efficiency, and other environmentally friendly features.
 |
|
 |
| MEDICAL UNIVERSITY OF SOUTH CAROLINA |
|
- First Floor Pharmacy - 3,500 square foot Renovation
- Offices at 3 Doughty Street Exterior Restoration
- College of Pharmacy Chemistry Lab Renovation
- Nurses Stations Renovations for the 7th & 8th Floors Children's Hospital
- Dental Medicine Site work
- IDC ERCP Room Renovation on 3rd Floor Main Hospital
- Family Medical Practice Renovation
- IDC Restroom Renovations - includes 6 restrooms in the Main Hospital and Children's Hospital
- IDC Pediatric Office Renovations - 2nd floor Rutledge Tower
- Nurses Station Replacement
- Parking Garage II Structural Improvement
- Radiology Support
- Hollings Cancer Center Expansion Utility Relocation
- Harborview Office Tower Garage Improvements
- IDC Pediatric Bariatric Restroom Renovation
- Campus Wide Storm Drainage Mitigation
- Campus High Voltage Substation Upgrade Replace Power Station Distribution Centers A & B
- Campus Elevators Upgrade - Walton Research
- Main Hospital 6th Floor SW Renovation
- Ashley Avenue Pharmacy Renovation
- Nuclear Pharmacy Renovation
- Children's Pharmacy Renovation
MEDICAL UNIVERSITY HOSPITAL AUTHORITY
- Main Hospital 9th and 10th Floor West Renovations
- Interim Children's Emergency Room Renovation
- Pediatric Radiology Waiting Room and Corridors Upgrades
- Radiation Oncology 1st Floor West Main Hospital - New exam rooms and waiting area
- Radiology Oncology Waiting Room Renovation
 |
|
 |
| PODS WAREHOUSE |
$1,186,000 |
A 48,000 square foot pre-engineered metal warehouse construction for Portable On Demand Storage with attached 1,500 square foot of office space.
 |
|
 |
| 5515 RIVERS AVENUE |
$373,000 |
A 30,000 square foot metal building was constructed to include a office and training area for Palmetto Training Facility in North Charleston, South Carolina.
|